Getting EV Ready: A Private Development Perspective

More electric vehicles are coming. Within 1-2 years it is expected that operational costs associated with a zero emissions vehicle (ZEV) will be on par or even lower than costs associated with an internal combustion engine (ICE). And the recently adopted federal infrastructure bill places an even stronger focus on incentives for encouraging electric vehicle adoption.

On December 14 and 16, we're holding TES events for our colleagues and friends in the Pacific Northwest. These presentations and discussions will cover the state of practice with EVs and ZEVs, how Oregon is setting national leadership through the Transportation Electrification Infrastructure Needs Analysis (TEINA) project, and practical considerations for private and public organizations in light of the infrastructure bill. This event will focus on considerations for residential, office, retail, and institutional developments and construction plans.

This event will be held on Microsoft Teams. Please join us at this link: https://bit.ly/3xMnCxr

If you do not have Teams downloaded, you will have the option to join via browser. You can also call in at this number: +1 971-277-2148, conference ID 906 661 878#